To:sot_shift from: Dan Schwartz date: 04 May 01, 12:00noon EDT Subject: SOT shift report 2001-05-04 L652 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/ascwww/AXAF/extra/science/htdocs/acis/SOT_reports/May_04_2001_L652.txt. Shift L652. Start at 124:12:00 GMT = 08:00am 04 May EDT End 12:00 noon 04 May SOT Lead DAS Spac/Aspect FOT/Sci liason HRC ACIS (Times will be given in GMT on day 124.) PLAN ---- Continue running load Apr 2901A. Finish CTI measurements during perigee egress and then start 31 hour ACIS-I observation 2228 of the distant cluster of galaxies RX J1317.4+2911. ACIS-I observation 2204 of the cluster A2034 will complete the orbit and the week. Next Comms: 124:21:00 to 22:00 125:06:00 to 07:00 125:15:00 to 17:00 126:00:00 to 01:00 126:09:00 to 10:00 126:12:00 to 19:00 Previously reserved for OTG patch checkout, Orbital events: 2001:125:13:07:36.076 241 EAPOGEE ORBIT APOGEE 2001:126:20:50:42.256 241 EPERIGEE ORBIT PERIGEE 2001:128:04:34:46.596 242 EAPOGEE ORBIT APOGEE 2001:129:12:18:01.609 242 EPERIGEE ORBIT PERIGEE 2001:130:20:02:04.274 243 EAPOGEE ORBIT APOGEE EVENTS ------ Status at AOS, 124:12:02, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 6 FIDS = 0 RA = 210.002 deg Dec = 0.001 deg ROLL = 214.553 deg Format = 2 OBSID = 61649 CTI measurement SIM FA = -467 SIM TSC = -99616 (HRC-S) HETG = OUT (79.84 deg) LETG = OUT (78.34 deg) HRC-S HV is ON EPHIN Geom = LARG A-leak = 0.4240 mu-a B-leak = 0.0800 mu-a Ascending through 70091 km. ACIS focal plane temperature -119.2. 12:20 Start maneuver 12:23 All stars lost. 12:39 All stars, fids, reacquired. In normal point mode. Status at LOS, 124:12:58, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 5 FIDS = 3 RA = 199.319 deg Dec = 29.197 deg ROLL = 208.389 deg Format = 2 OBSID = 2228 RX J1317.4+2911 SIM FA = -535 SIM TSC = 89719 (ACIS-I) HETG = OUT (79.84 deg) LETG = OUT (78.34 deg) HRC-S HV is ON EPHIN Geom = LARG A-leak = 0.4000 mu-a B-leak = 0.0760 mu-a Ascending through 75602 km. ACIS focal plane temperature -119.5. NOTES/ISSUES/PROBLEMS ACIS probably too warm for valid CTI measurement. EPHIN values look erratic in the snapshot. ACIS CAP review approved CAP 725, pending verification of loads, for use of the contingency comm time 126:12:00 to 19:00, which is no longer needed for OTG software checkout. From the 9am status meeting: 9.1a test products will be out this morning. Anticipate MAY1401 products to be circulated Monday, for a load review on Tuesday. Quick look data: No new quick looks this shift. ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 FAX: (617)495-7356 cell phone: (617)512-5627 pager: 877-693-7198 PIN 693-7198 or e-mail 6937198@archwireless.net -------------------------------------------------------