Nov_09_2001_L841.txt Shift L841 Start at 2001:313:12:30:00 GMT = 2001 Nov 9 7:30am EDT End 2001 Nov 9 11:30am EDT SOT shift report 2001-11-09 L841 See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/ascwww/AXAF/extra/science/htdocs/acis/SOT_reports/Nov_09_2001_L841.txt SOT Lead Bill Podgorski SOT SC/ACA FOT-SI HRC-SI ACIS-SI OTHER Plan: - Now running NOV0901A just past apogee. Observing 'MG J0414+0534', obsid 3395. A Fast X-Ray Transient (or X-Ray Flash) TOO, 'FXRT011030', obsid 3411, was approved last night. A replan load, NOV0901B, is in process. This load picks up at 313:1631, with a stop science for obsid 3395 and a maneuver to the TOO. Space Weather Report: Radiation: ACE soft proton flux is at about 3700 and continuing to decrease very-very slowly. EPHIN data in last 2 passes today: Trip 313:0557 313:1400 E1300: 10.0 0.5 0.4 P4GM: 300 27 18 P41GM: 8.47 0.3 0.03 Solar Activity Prediction: There have been several M class flares in the past 12 hours. Sunspot 9690 is very large and has the potential for an X-class flare. COMM: DOY AOS LOS 2001 313.208 2001 313.250 313 0400 0500 0600 DSS-34 2001 313.583 2001 313.625 313 1300 1400 1700 DSS-54 2001 313.944 2001 314.027 313 2200 2240 0040 DSS-16 Seq # ObsID It Target start time SI Grat RA dec roll slew ---------------------------------------------------------------------------------------------------------- NOV0901A Load: ---- I3395 00 CAL-ER 2001:313:07:49:58.941 0.0 -- -- 135.0000 -27.0000 75.05 87.15 700608 03395 00 MG J0414+0534 2001:313:08:34:38.941 29.0 ACIS-S NONE 63.6628 5.5588 57.20 76.15 290149 02593 00 BETELGEUSE 2001:313:17:05:58.941 4.5 ACIS-I NONE 88.8024 7.3840 73.08 31.20 NOV0901C (TOO) Load: ---- ITOO1 00 CAL-ER 2001:313:17:15:51.974 0.0 -- -- 45.0000 35.0000 179.44 118.65 100031 03411 00 FXRT011030 2001:313:17:44:22.777 47.1 ACIS-S NONE 310.8055 77.3002 277.77 57.81 ---- T_E12 00 CAL-ER 2001:314:07:40:45.112 7.6 -- -- 2.2000 4.1000 290.51 93.12 ---- GG_12 00 CAL-ER 2001:314:10:46:13.515 3.6 -- -- 10.2500 33.7500 254.69 44.78 ORBITAL EVENTS: 2001:313:07:24:21.071 312 EAPOGEE ORBIT APOGEE 2001:314:09:47:25.118 312 EE1RADZ0 ELECTRON1 RADIATION ENTRY0 2001:314:13:19:25.118 312 XE1RADZ0 ELECTRON1 RADIATION EXIT0 2001:314:14:13:25.118 312 EE1RADZ0 ELECTRON1 RADIATION ENTRY0 2001:314:15:08:54.429 312 EPERIGEE ORBIT PERIGEE EVENTS DONE OBSID -------------- ---- ----- Start Shift 313:1230 AOS DSS-54 313:1400 3395 Status at AOS was as expected (see note 1) Run CAP 759B to stop NOV0901A loads 313:1512 and uplink/start NOV0901C loads CAP Complete 313:1527 First cammand in new loads 313:1634 61415 (start maneuver to TOO target) End of shift 313:1640 NOTES/ISSUES/PROBLEMS --------------------- 1) Status at AOS: NOTE: Snapshot shows SIM FAPos = -467 in red. It is really correct. UTC 2001:313:14:27:20 (Nov 9) f_ACE 3.11e+03 F_CRM 1.10e+08 Kp 1.7 R km 133349D OBT 2001:313:14:26:49 CTUVCDU 11270527 OBC s/w NRML FMT2_NORM CPEstat NORM OBT 121703209.48 ONLVCDU 11270512 OBC Errs 0 OBSID 3395 EPState SUN SIM TTpos 75623 HETG Angle 79.46 PCADMODE NPNT RA 63.662 Bus V 29.77 SIM FApos -467 LETG Angle 77.96 PCONTROL NPNT Dec 5.559 Bus I 29.75 AOFSTAR GUID Roll 57.201 ACA Object FFFSSSSS Dither ENAB HRC-I HV ON ACA ImFunc TTTTTTTT Dith Yang -1.35 Yaw Rate -0.14 HRC-S HV OFF ACA CCD Temp -10.4 Dith Zang -1.29 Pitch Rate -0.02 OBSMode NEXT ACA Int Time 1.698 Roll Rate -0.08 Door OP UNAC AOACSTAT OK FSS SunBeta NSUN Door CL UNAC FSS Alfa -49.62 Batt 1 SOC 100.00% Avg HRMA Temp 70.61 FSS Beta -49.78 Batt 2 SOC 100.00% ACIS Stat7-0 65 Avg OBA Temp 50.73 SA Resolv 158.26 Batt 3 SOC 100.00% Cold Rad -127.9 OBA Tavg Fault NFLT SA Sun Pres ILLM Warm Rad -82.0 OBA Trng Fault NFLT +Y SA Amps 14.49 RadMon ENAB HRMA power 31.70 SCS 128 DISA -Y SA Amps 14.88 EPHIN Geom LARG OBA power 169.70 SCS 129 ACT +Y SA Temp 115.49 E150 577.6 SCS 130 ACT -Y SA Temp 116.22 E300 17.7 Roll Mom. -8.450 SCS 107 INAC E1300 0.3 Pitch Mom. -6.990 UpL Cmd Acc 53122 EPH A-Leak 1.0200 P4GM 19.9 Yaw Mom. 6.782 Cmd Rej A 245 EPH B-Leak 0.2480 P41GM 0.1 Explanation Current Data: UTC 2001:313:14:27:20 (Nov 9) f_ACE 3.11e+03 F_CRM 1.10e+08 Kp 1.7 R km 133349D Currently scheduled FPSI, OTG : ACIS-S NONE Costello Kp : 2.00 ACE EPAM P3 Proton Flux (p/cm^2-s-sr-MeV) : 3.11e+03 Orbit Start Time : 2001:311:23:44:00 Geocentric Distance (km), Orbit Leg : 133440 D CRM Region : 2 (Magnetosheath) External Proton Flux (p/cm^2-s-sr-MeV) : 1.04443000000e+04 Attenuated Proton Flux (p/cm^2-s-sr-MeV) : 1.04443000000e+04 External Proton Orbital Fluence (p/cm^2-sr-MeV) : 2.44222107360e+09 Attenuated Proton Orbital Fluence (p/cm^2-sr-MeV) : 1.09555116000e+08 HRC IM PS = ON Stp 42/53 SP PS = OFF Shield 1 HV = OFF Shield 2 HV = OFF Valid Event Rate 1 = 0 Valid Event Rate 2 = 0 Shield Event Rates = 0 ACIS FP Temp = -119.7 DEA Pwr = 48.6 DPA Pwr = 42.8 Science State = Science Active 2) Notes from 9:00am meeting: Operations (Darrel): - 4 supports last 24 hrs, 2 34m, 2 26m, incl one 26m automation test - Yesterday morning's DSS-54 support was aborted due to an antenna problem, switched to DSS-66. - DSS-54 support at 312:2000 had high data dropout ratetowards end. Did not dump all data, so day 312 data is incomplete until current pass data is dumped. - Uplinked 2 load segments from NOV0901A, good thru 316:0207 - 26m automation test on DSS-16 went well. Were able to dump at 512KB rate at alt of 124,000km. - Ran CAP 675 to enable SCS107 - Ran CAP 753B to do an ACIS CTI Mission Planning (Ken): - NOV0901A load approved at 11am review. Uplinked at 3pm and started. - NOV1201 load review held at 1pm, couple of issues, will put new products out this AM for a review today ay 2pm. - Last night a TOO was approved (see above). Loads built and reviewed, some issues identified, new loads NOV0901C built, reviewed and have been approved. S/C Engineering(Dan): - S/C is OK - CAP to uplink momentum new momentum deadzone and auto-unload threashold was approved. Operation will be done Monday night from 7pm-11pm local. - Eric Martin reported to FDB on dropout of Kalman stars during last few days. It was due to ionizing radiation flag. Going to do a study of this. SOT(Bill): - Radiation discussion - see above. DSOPS(Jen): - No QL's Meetings/events: - 9:30am, CAP review - 10am, CSC tagup - 2pm, load review, NOV12 3) Quick look data: Seq # ObsID It Target start time SI Grat Comment ----------------------------------------------------------------------------------------------------------