To:sot_shift from: Dan Schwartz date: 13 Jun 06, 12:00noon EDT Subject: SOT shift report 2006-06-13 L2518 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/web-cxc/htdocs/acis/SOT_reports/Jun_13_2006_L2518.txt. Shift L2518. Start at 164:12:00 GMT = 08:00am 13 Jun EDT End 10:00am 13 Jun SOT Lead DAS (Times will be given in GMT on day 164.) PLAN ---- Continue running load JUN1206A. Finish obsid 7326, a GTO ACIS-S/HETG observation of the young stellar cluster in the epsilon Chamaeleontis Group, probing the X-ray emission mechanism in the Herbig Ae star, HD104237. Then perform cti measurements surrounding perigee passage. Next Comms: 164:1240 to 1340 164:1850 to 1950 164:0050 to 0145 165:1140 to 1240 165:2115 to 2215 166:0300 to 0400 166:1130 to 1230 166:2100 to 2200 167:0345 to 0445 167:1155 to 1255 Orbital events: 2006:163:19:06:29.116 946 EAPOGEE ORBIT APOGEE 2006:165:02:49:48.646 946 EPERIGEE ORBIT PERIGEE 2006:166:10:34:20.974 947 EAPOGEE ORBIT APOGEE 2006:167:18:17:39.865 947 EPERIGEE ORBIT PERIGEE 2006:169:02:02:36.454 948 EAPOGEE ORBIT APOGEE 2006:170:09:46:14.477 948 EPERIGEE ORBIT PERIGEE 2006:171:17:30:12.756 949 EAPOGEE ORBIT APOGEE EVENTS ------ Status at AOS, 164:12:42, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 5 FIDS = 3 RA = 179.935 deg Dec = -78.170 deg ROLL = 273.458 deg Format = 2 OBSID = 7326 HD104237 SIM FA = -467 SIM TSC = 75623 (ACIS-S) DITHER = ENAB HETG = IN ( 5.96 deg) LETG = OUT (77.59 deg) HRC-I HV is ON EPHIN Geom = SMAL E150 = 27.4 E300 = 4.2 E1300 = 5.0 LT 20.0 (RADMON P4GM = 0.0 LT 300. Triggers) P41GM = 0.0 LT 8.47 A-leak = 1.0200 mu-a B-leak = 0.0000 mu-a Descending through 97531 km. ACIS focal plane temperature -119.5 degC. EPH temp: 103.64 degF EPH 27V: 11.83 1340: LOS expected. Status is essentially unchanged. Descending through 94019 km. ACIS focal plane temperature -119.5 degC. EPH temp: 104.89 degF EPH 27V: 11.83 NOTES/ISSUES/PROBLEMS From the 9am status meeting: Three supports over the past 24 hours (including one in progress). No issues. One segment of JUN1206A uplinked, on-board loads good until 167:14:13. JUN1906A products were out yesterday, for a load review at 2pm today. The OFLS patch 11.5.3 has been installed on string 3 for testing. This is to correct a corruption when creating OBC patch command files for uplinking. At 10am there will be a kickoff meeting for the Mission Planning and Constraints working group. This group will provide oversight and coordination of mission planning and scheduling activities, with a view to optimizing efficiency and managing the CARD and mission planning guidelines. In OCC conference room and on 405 244 5060 1159# Quick look data: OBSID Target Time Comment ----- ------ -------------- ------- 7190 Abell 2589 162:21:11 ACIS-S NONE Looks good ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 cell phone: (617)512-5627 pager: email to 6175125627@vtext.com -------------------------------------------------------