To:sot_shift from: Dan Schwartz date: 30 Nov 06, 12:00noon EST Subject: SOT shift report 2006-11-30 L2688 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/web-cxc/htdocs/acis/SOT_reports/Nov_30_2006_L2688.txt. Shift L2688. Start at 334:13:00 GMT = 08:00am 30 Nov EST End 10:00am 30 Nov SOT Lead DAS (Times will be given in GMT on day 334.) PLAN ---- Continue running load NOV2706A. Emerge from perigee and do obsid 8485, an ACIS-S/HETG observation of the active M dwarf binary EQ Peg, a continuation of a long observation to determine the plasma properties at different activity levels. Then do obsid 6936, an ACIS-S observation of Abell 562, to study the interaction of the wide-angle tailed radio sources with the intracluster medium. Next Comms: 334 1915 1955 2055 335 0130 0230 0330 335 1100 1200 1300 335 1700 1800 1900 336 0050 0150 0250 336 1030 1110 1210 336 1805 1905 2005 Orbital events: 2006:334:08:25:23.424 1010 EPERIGEE ORBIT PERIGEE 2006:335:16:09:12.999 1011 EAPOGEE ORBIT APOGEE 2006:336:23:53:38.192 1011 EPERIGEE ORBIT PERIGEE 2006:338:07:36:39.942 1012 EAPOGEE ORBIT APOGEE 2006:339:15:20:46.448 1012 EPERIGEE ORBIT PERIGEE EVENTS ------ Status at LOS, 126:10:28, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 8 FIDS = 0 RA = 35.501 deg Dec = 23.802 deg ROLL = 271.800 deg Format = 2 OBSID = 58664 egress cti SIM FA = -467 SIM TSC = -99616 (HRC-S) DITHER = ENAB HETG = OUT (79.09 deg) LETG = OUT (77.59 deg) HRC-I HV is ON EPHIN Geom = SMAL E150 = 1011512.2 E300 = 8752.6 E1300 = 9.8 LT 20.0 (RADMON P4GM = 10536.6 LT 300. DISABLED) P41GM = 0.1 LT 8.47 A-leak = 1.0200 mu-a B-leak = 1.0200 mu-a Ascending through 46251 km. ACIS focal plane temperature -116.6 degC. EPH temp: 89.48 degF EPH 27V: 21.23 NOTES/ISSUES/PROBLEMS From the 9am status meeting: Three supports over the past day. No issues. DEC0406A products were approved yesterday. Lucky will be down for about 1/2 hour after the 9am meeting tomorrow. FDB today will consider the ACA acquisition anomaly flight note closeout, and the tertiary database update patch (and backout patch). Weekly FOT/IST tagup: We are ready for the SPS soak test. May start in mid-Jan, JPL is driving the readiness. There will be a demo of the new telephone voice-loop call-in next Tuesday, 10am in the action room. Quick look data: OBSID Target Time Comment ----- ------ -------------- ------- 6389 M33 Field 7 332:13:27 ACIS-I NONE Looks good. ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 cell phone: (617)512-5627 pager: email to 6175125627@vtext.com -------------------------------------------------------