To:sot_shift from: Dan Schwartz date: 26 Sep 06, 12:00noon EDT Subject: SOT shift report 2006-09-26 L2623 -------- See http://asc.harvard.edu/acis/SOT_reports/sot-shift.html, or /proj/web-cxc/htdocs/acis/SOT_reports/Sep_26_2006_L2623.txt. Shift L2623. Start at 269:12:00 GMT = 08:00am 26 Sep EDT End 10:00am 26 Sep SOT Lead DAS (Times will be given in GMT on day 269.) PLAN ---- Finish running load SEP2506B by completing obsid 6377, an ACIS-I observation of M33 as part of a very deep study of the closest face on spiral galaxy. Then start the SEP2506C loads with obsid 6688, an ACIS-S observation of G13.9-0.0 to search for a very young supernova remnant. Then do 8214, an ACIS-I observation as part of a multi-wavelength study of the central 300x80 pc of the Galaxy. Next Comms: 269:1840 to 2040 270:0345 to 0445 270:1040 to 1150 270:1640 to 1740 271:0400 to 0500 271:1100 to 1200 271:1845 to 1930 271:2100 to 2200 Orbital events: 2006:269:13:35:15.177 986 EAPOGEE ORBIT APOGEE 2006:270:21:18:58.265 986 EPERIGEE ORBIT PERIGEE 2006:272:05:02:55.868 987 EAPOGEE ORBIT APOGEE 2006:273:12:46:20.823 987 EPERIGEE ORBIT PERIGEE 2006:274:20:30:59.151 988 EAPOGEE ORBIT APOGEE 2006:276:04:14:13.369 988 EPERIGEE ORBIT PERIGEE 2006:277:11:59:10.177 989 EAPOGEE ORBIT APOGEE 2006:278:19:42:56.849 989 EPERIGEE ORBIT PERIGEE EVENTS ------ Status at LOS, 126:10:28, was as follows: PCAD MODE = NPNT CONTROL LAW FLAG = NPNT Stars: = 5 FIDS = 3 RA = 23.492 deg Dec = 30.660 deg ROLL = 141.786 deg Format = 2 OBSID = 6377 M33, field 1 SIM FA = -535 SIM TSC = 92903 (ACIS-I) DITHER = ENAB HETG = OUT (79.09 deg) LETG = OUT (77.59 deg) HRC-S HV is ON EPHIN Geom = SMAL E150 = 13.7 E300 = 0.0 E1300 = 0.0 LT 20.0 (RADMON P4GM = 0.0 LT 300. Triggers) P41GM = 0.0 LT 8.47 A-leak = 1.0200 mu-a B-leak = 1.0200 mu-a Ascending through 121394 km. ACIS focal plane temperature -117.8 degC. EPH temp: 92.71 degF EPH 27V: 19.40 NOTES/ISSUES/PROBLEMS ACIS is 2 deg C warmer than setpoint during the current M33 observation! From the 9am status meeting: Three supports over the past day, no issues. Three segments of SEP2506C were uplinked, on-board loads are good until 274:17:26. SEP2506C ToO products were reviewed and approved yesterday. OCT0206 products are in work -- should be out mid-morning for review tomorrow. We are preparing for fast processing of the ToO, obsid 6724. A test of the new voice system yesterday revealed issues with the full team loading the system. Needs more work to reach operational status. Quick look data: OBSID Target Time Comment ----- ------ -------------- ------- 6645 Sgr A* 268:14:06 ACIS-I NONE looks good 6566 SDSS J0129+3842 268:16:45 ACIS-S NONE looks good ------------------------------------------------------- Dan Schwartz, MS #3 das@head-cfa.harvard.edu phone: (617)495-7232 cell phone: (617)512-5627 pager: email to 6175125627@vtext.com -------------------------------------------------------