BEP_PCB temperatures check

Summary

Date start 2019:312:13:35:01.285
Date stop 2019:314:14:03:27.955
Model status OK (Planning Limit = 42.0 C)
Load directory /data/acis/LoadReviews/2019/NOV0919/ofls
Run time Mon Nov 4 17:31:26 2019 by acisdude
Run log run.dat
Temperatures temperatures.dat
States states.dat

No TMP_BEP_PCB Hot Violations

No TMP_BEP_PCB Cold Violations

tmp_bep_pcb.png pow_sim.png roll.png

BEP_PCB Model Validation

MSID quantiles

Note: BEP_PCB quantiles are calculated using only points where TMP_BEP_PCB > 20.0 degC.

MSID 1% 5% 16% 50% 84% 95% 99%
TMP_BEP_PCB -4.46 -3.92 -3.06 -1.64 -0.45 0.27 1.84
PITCH -4.337 -0.265 -0.207 -0.048 0.196 0.264 3.337
TSCPOS -1 -1 -1 -1 0 0 1
ROLL -1.685 -1.067 -0.490 -0.186 0.307 1.248 1.681

Validation Violations

MSID Quantile Value Limit
TMP_BEP_PCB 1 -4.46 2.00
TMP_BEP_PCB 50 -1.64 1.00
PITCH 1 -4.337 3.00
PITCH 99 3.337 3.00

TMP_BEP_PCB

Note: BEP_PCB residual histograms include points where TMP_BEP_PCB >= 20.0 degC in blue and points where TMP_BEP_PCB <= 20.0 degC in red.

Red = telemetry, blue = model

tmp_bep_pcb_valid.png tmp_bep_pcb_valid_hist_log.png tmp_bep_pcb_valid_hist_lin.png

PITCH

Red = telemetry, blue = model

pitch_valid.png pitch_valid_hist_log.png pitch_valid_hist_lin.png

TSCPOS

Red = telemetry, blue = model

tscpos_valid.png tscpos_valid_hist_log.png tscpos_valid_hist_lin.png

ROLL

Red = telemetry, blue = model

roll_valid.png roll_valid_hist_log.png roll_valid_hist_lin.png