BEP_PCB temperatures check

Summary

Date start 2019:272:06:46:00.000
Date stop 2019:280:05:05:59.794
Model status OK (Planning Limit = 42.0 C)
Load directory /data/acis/LoadReviews/2019/SEP3019/ofls
Run time Thu Sep 26 07:46:11 2019 by acisdude
Run log run.dat
Temperatures temperatures.dat
States states.dat

No TMP_BEP_PCB Hot Violations

No TMP_BEP_PCB Cold Violations

tmp_bep_pcb.png pow_sim.png roll.png

BEP_PCB Model Validation

MSID quantiles

Note: BEP_PCB quantiles are calculated using only points where TMP_BEP_PCB > 20.0 degC.

MSID 1% 5% 16% 50% 84% 95% 99%
TMP_BEP_PCB -3.90 -3.59 -2.97 -1.55 -0.45 1.11 1.58
PITCH -4.672 -0.252 -0.147 -0.012 0.211 0.272 4.226
TSCPOS -1 -1 -1 0 0 1 1
ROLL -1.423 -1.010 -0.488 -0.127 0.352 0.947 1.675

Validation Violations

MSID Quantile Value Limit
TMP_BEP_PCB 1 -3.9 2.00
TMP_BEP_PCB 50 -1.55 1.00
PITCH 1 -4.672 3.00
PITCH 99 4.226 3.00

TMP_BEP_PCB

Note: BEP_PCB residual histograms include points where TMP_BEP_PCB >= 20.0 degC in blue and points where TMP_BEP_PCB <= 20.0 degC in red.

Red = telemetry, blue = model

tmp_bep_pcb_valid.png tmp_bep_pcb_valid_hist_log.png tmp_bep_pcb_valid_hist_lin.png

PITCH

Red = telemetry, blue = model

pitch_valid.png pitch_valid_hist_log.png pitch_valid_hist_lin.png

TSCPOS

Red = telemetry, blue = model

tscpos_valid.png tscpos_valid_hist_log.png tscpos_valid_hist_lin.png

ROLL

Red = telemetry, blue = model

roll_valid.png roll_valid_hist_log.png roll_valid_hist_lin.png