CAP Checklist Date: 12/14/04 CAP#: 949 _ |x| Has the interaction with the load been checked? Yes, these two ACIS FP temperature commands do not interfere with any commands in the load. _ |x| Has comm been identified and duration estimated accurately? Yes: opportunity at 2004:349:17:05 - 2004:349:18:05 Yes: opportunity at 2004:350:20:40 - 2004:350:22:40 _ |x| If SCS slots are used, is there SCS slot contention? No. _ |x| Does the CAP perform SCS slot cleanup? Yes, the CAP performs immediate SCS cleanup. _ |x| Does the CAP set the correct format at completion? N/A, FMT 1 is used throughout. _ |x| What happens if comm is lost during the CAP execution? It depends on which point in the CAP. If before step 2, the 126~C command will never be sent. If after step 2 but before step 3, ACIS will not see the TLM verifier. If after step 3 but before step 4, the SCS slot will not be cleared and will need to be cleared at the next COM. A similar logic follows for steps 5-8 in which the FP temperature is reset to the operational point. There are two COM opportunities after the 2004:350:2040 pass to reset the ACIS FP temperature to the operational point before the next ACIS science observation. _ |x| Does CAP require radmon to be enabled or disabled to be compatible with current load? CAP expects RADMON to be enabled. _ |x| What is the worst case scenario for the CAP execution? The worst case scenario is that the ACIS FP temperature cannot be reset to the operational point at the 2004:350:2040 pass. - what science can be lost? CTI measurements done at incorrect FP temperature. - does action generate significant momentum? No - can safe mode be triggered during the CAP? No _ |x| List (or attach list) of products that are required (loads, scripts, SOPs). Include version number for scripts and SOPs. 1. 1A_WS033_249.CLD 2. 1A_WS032_249.CLD 3. O_SCSCTRL (V3.4) 4. O_PROT_SCSCTRL (V3.2) _ |x| Are all products certified and do SOP and scripts have version 3.0 or higher? Yes _ |x| Has OC verified that all required products are available on console? - Yes, will be done as part of this CAP review _ |x| Does the CAP require an OBSID change? No. _ |x| If a Flight Software Patch, has the checkbook checksum been compared with the value in the CAP? N/A _ |x | Who will be on-console and is the CAP being run at a reasonable time? Yes, OC/CC, ACIS 12/15/04: 12:05pm-1:05 pm EST 12/16/04: 3:40pm-5:40 pm EST _ |x| Has CAP been reviewed by FD, FOM, SOT lead and OC or their designee? Comments: None To be attached to the signed CAP. Rev 1.6, 13 Dec 2001, RJB