DPA-B Anomalous Shutdown (BEP-A Active)¶
What is it?¶
The DPA-B shuts down anomalously, presumably due to a spurious command.
Note
IMPORTANT: The diagnosis and response to the anomaly presented in this document assumes that BEP A, powered by DPA side A, is the active BEP.
This anomaly requires human intervention to recover to science operations.
When did it happen before?¶
The DPA-B has shut down once:
December 13, 2007: 2007:347:17:50, obsid 58072
Will it happen again?¶
It appears likely that the anomaly will occur again.
How is this anomaly diagnosed?¶
Within a major frame (32.2 seconds), one should see:
1DPPSB (DPA-B Power Supply On/Off) change from 1 to 0 (On to Off)
1DPP0BVO (DPA-B +5V Analog Voltage) drop to 0.0 +/- 0.3 V
1DPICBCU (DPA-B Input Current) drop to < 0.2 A
DPA-B POWER should go to zero
1DP28BVO (DPA-B +28V Input Voltage) is expected to have a small uptick, ~0.5 V, consistent with the load suddenly dropping to zero. May require more than 1 major frame.
If 1STAT2ST = 0, the DPA-B shutdown has caused a watchdog reboot of the BEP in use. This will happen if the DPA-B shuts down during an observation which is using B-side FEPs. If a watchdog reboot occurs, the software will revert to Version 11.
All other hardware telemetry should be nominal. The current values for these can be found on our Real-Time Telemetry pages. Older data can be examined from the dump files or the engineering archive.
To extract information from the dump data, run ACORN on it as per the instructions in “Running ACORN on data dumps in the case of an anomaly (04/06/16)”. Information from the tracelog files written by the ACORN tools can be plotted using the Python or command-line interfaces to ACISpy, see below for details.
What is the response?¶
Our real-time web pages will alert us and the Lead System Engineer will call us. We need to:
Send an email to the ACIS team at the official anomaly email address,
acis-anomaly -at- googlegroups -dot- com
. If it is off-hours, another ACIS Ops team member should call Peter, Bob, and Jim Francis.Send an email to
sot_red_alert@cfa
announcing that the ACIS team is aware of the DPA-B shutdown and is investigating, and that a telecon will be called when more information is available.Contact the GOT Duty Officer to inform that we need the dump data as soon as possible and to email or call us when the dump file is available.
Process the dump data and make sure that there is nothing anomalous in the data BEFORE the shutdown. We want to know if a new occurrence looks just like the single previous occurrence. If yes, it should appear as if in one frame the DPA-B turned off.
Once analysis of the dump data is complete, convene a telecon at the next reasonable moment with the ACIS team and review the diagnosis. The MIT ACIS team (Peter Ford, Bob Goeke, Mark Bautz, and Bev LaMarr) should also be included in the discussion, either in the telecon or via email. If the diagnosis is consistent with previous DPA-B anomalies, proceed with the recovery. If the diagnosis is not consistent with previous DPA-B anomalies, stop and start a more involved analysis with the ACIS team.
As soon as the time of the DPA-B shutdown is known, inform
sot_yellow_alert@cfa
.Identify whether or not additional comm time is needed and if so ask the OC/LSE to request it.
Send an email to
sot_red_alert@cfa
and call a telecon with the FOT, SOT, and FDs to brief them on the diagnosis and the plan to develop CAPs to recover.Prepare the CAPs and submit them for review to capreview AT ipa DOT harvard DOT edu, and cc: acisdude. It will also be necessary to call the OC/CC to determine which number should be used for the CAPs.
The steps in the main recovery CAP will depend on whether or not the active BEP has executed a watchdog reboot. This may happen if the shutdown occurs during an observation that utilizes the side B FEPs (DPA side B powers FEPs 3-5), or if a subsequent observation requests them. Observations using three or more CCDs require DPA Side-B FEPs and will result in a bus error/watchdog reset (Side-A’s FEP 0 is reserved for six CCD observations). Observations using only one or two CCDs need only DPA Side-A FEPs and won’t be watchdog reset upon loss of the Side-B power. (As of this writing there are two exceptions, the Next-In-Line and the 2-CCD ECS SI modes which use FEPs 1 & 4 and would cause a watchdog reboot.)
If BEP A - the active BEP - has not executed a watchdog reboot, the steps should be:
Turn on DPA side B (
SOP_ACIS_DPAB_ON
, this can be executed even if a science run is currently in progress, see note below).
Otherwise if, in addition to this anomaly, the BEP A has executed a watchdog reboot, the steps should be:
Stop the science run and power down the FEPs and video boards (
SOP_61021_STANDBY
)Turn on DPA side B (
SOP_ACIS_DPAB_ON
)Warm-boot the BEP and start a DEA housekeeping run (
SOP_ACIS_WARMBOOT_DEAHOUSEKEEPING
).Set 3 FEPs on by issuing a WSPOW0002A command (1AWSPOW0002A_206.CLD).
The current standard, safe configuration for ACIS is 3 FEPs (1, 3, & 5) powered on and not clocking. The last step in the recovery in the case of a watchdog reboot listed above issues a WSPOW0002A command to put ACIS in the 3 FEPs powered on and not clocking configuration.
A CAP to update txings values from their defaults to the most-recent settings should follow the main recovery CAP if possible. CAP 1708 was used at the latest ACIS FSW patch: HJK Version 60. You can use that CAP as a template for this. But you must use the latest txing parameter set (which may not be the values used in 1708). You can find CAP1708_TXINGB_SETPARAMS.docx in
acis_docs/CAPs
:CAP1708_TXINGB_SETPARAMS
. Refer to the most recent txings SAR for the current optimal values for the txings parameters.Execute the recovery CAPs at the next available comm.
Write a shift report and distribute to
sot_shift
to inform the project that ACIS is restored to its default configuration.
Note
At this point in the mission (Jan 2017), during observations, it is standard practice to power off unused FEPs to reduce power consumption and keep the electronics temperatures lower. For this reason, it is believed that it is safe to power on the DPA side B during a science run that does not use these FEPs. If this practice is changed later in the mission, this procedure may have to be revisited.
Impacts¶
Until the DPA-B is powered back on, science operations which require the use of the side B FEPs will be affected.
If it is necessary to warm boot the BEP, this will reset the parameters of the TXINGS patch to their defaults. If not updated during initial recovery as above, txings settings should be updated as soon as possible via CAP (see CAP 1708) or SAR to prevent undesired radiation shutdown.
Relevant Procedures¶
SOT Procedures¶
FOT Procedures¶
CLD Scripts¶
1AWSPOW00002A_206.cld
(OBC-A side)Located at:
/data/acis/acis_docs/command_load/1AWSPOW0002A_206.cld
and1AWSPOW0002A_206.txt
CAPs¶
Relevant Notes/Memos¶
Flight Note 417 (this flight note covered the December 2002 DPA-A Shutdown and was used to close this issue out as well.)