First page Back Continue Last page Summary Graphics
Operations
Load interrupt TOOs
- Date Target Request
- 08/12/02 GRB020813 24 hours
- 10/04/02 GRB020531 24 hours
- 10/24/02 MKN 421 3 days
- 11/04/02 SGR1900+14 3 days
Operations Ground System Updates
- Date Version Change
- 09/19/02 OFLS 9.4 Compatible with AGASC 1.5
- 09/26/02 AGASC 1.5 Improved color and position data
- 10/10/02 SAUSAGE 1.0 Star Selection tool
Notes: