Mar 17, Summary of Radiation and Replan Discussion
-----------------------------------------------------

Observing stopped by ground activation of SCS-107 at 2015:076:04:34z

ACE P3 rates are dropping and are expected to be well down by the time of the
next rad-zone exit (2015:078:04:42:46z).

Replan schedule reworked to get ObsIDs 16710 and 17057 in within their
observing windows. Schedule picks up at rad-zone exit. Products should be
released shortly for a review later today.

Clean-up actions include CAPs to disable SCS-29 and change from the current
ObsID.

The ACIS team is preparing a CAP for a long ACIS CTI data collection while we
wait to resume observing.