See http://cxc.harvard.edu/mta/SOT_reports/sot-shift.html Shift H5345. Start at 2014:069:19:30:00 GMT = 3:30pm March 10 2014 End at 2014:069:20:30:00 GMT = 4:30pm March 10 2014 ACIS SOT Shift Report March 10 2014 H5345. ACIS Personnel: Dick Edgar, Gregg Germain, Royce Buehler, Ed Morgan, Beverly Ferguson, Peter Ford PLAN -------- We intend to run CAP1309 to dump the ACIS EEPROM flight SW. This is an operational readiness exercise to prepare for the upcoming ACIS flight software patch. SUMMARY: -------- The CAP and associated SOP ran exactly as expected. TIMELINE (GMT day 311-312) ---------------------- 069:19:30 AOS on DSS 65 069:19:31 Verified proper ACIS configuration (FMT-2) ECS measurement in progress: OBSID 52940 069:19:31 FP Temp = -119.7 C 069:19:49 start CAP 1309 - Step 1 complete. 069:19:50 uplink CLD that contains dump command 1A_RB000_196.CLD 069:19:51 Step 2 complete 069:19:51 Step 3 complete 069:19:52 Correct Command Echo received (306) Awaiting all 259 BepReadReplyPackets from the dump 069:20:05 All 259 BepReadReplyPackets Received 069:20:07 Ground image and flight image agree 069:20:08 Step 4 completee (196 DISA) 069:20:08 Procedure completed 069:20:08 All telemetry looks nominal 069:20:08 FP Temp= -119.7 C 069:20:08 Event rate and threshold crossing look nominal 069:20:30 LOS