ACIS SOT Shift Report 2015-01-12 Shift: l5653 Start: 2015:012:21:05:00 4:05pm Jan. 12, 2015 End: 2015:012:22:08:00 5:08pm Jan. 12, 2015 ACIS Personnel: Dick Edgar, Gregg Germain, Royce Buehler, Peter Ford, Paul Plucinsky, Bob Goeke, Ed Morgan PLAN -------- We intend to run CAP1342 to execute the DPA-A Power Off Recovery SUMMARY: -------- The CAP and associated SOP ran exactly as expected. DPA-A was turned on and ACIS is now running version 53 of its flight SW. SOP_61038_DPAA_ON.SSC: successful Start SOP_ACIS_SW_STDFOPTG: successful SOP_SI_SET_ACIS_FP_TEMP_TO_M121C: successful TIMELINE (GMT day 012) ---------------------- 21:05 AOS on DSS 54 21:06 verify proper ACIS configuration, Science idle. - No Stop Science Command necessary 21:16 start CAP 1342 21:16 Format 2 21:16 Expected state. 21:16 Start SOP_61038_DPAA_ON - Enable and turn on DPA-A power supply 21:18 DPA turned on: SOP_61038_DPAA_ON successful 21:18 Flight Version Number: 11 21:19 Running SSR Dump to completion before continuing. 21:20 Bi-levles corrct 21:31 Start SOP_ACIS_SW_STDFOPTG - Load and execute V53 of the ACIS software 21:31 Verified Format 2 21:32 reset patch list 21:35 dump empty patch list 21:35 load standard rev F. patches 21:38 load smTimedLookup patch 21:39 load CC3X3 patch 21:41 load Event Histogram patch 21:42 load Compress All patch 21:42 load Threshold Crossing patch 21:44 load the patch version number 21:45 dump contents of patch to compare and verify 21:45 dumped patches verifies properly 21:46 warm boot the BEP to activate the patches 21:47 warm boot is successful, flight SW version 53 is running 21:51 load DEA HKP parameter block 21:54 enable and activate DEA HKP 21:58 all telemetry looks nominal 21:59 FP Temp= -118.3 22:00 Both SCS's cleared 22:00 the ACIS door is still open 22:00 exit SOP_ACIS_SW_STDFOPTG 22:01 Start SOP_SI_SET_ACIS_FP_TEMP_TO_M121C - Set the Focal Plane Temp setpoint to -121C 22:08 SOP_SI_SET_ACIS_FP_TEMP_TO_M121C completed 22:08 exit CAP 1342