See http://cxc.harvard.edu/mta/SOT_reports/sot-shift.html ACIS SOT shift report M6450 Dec 9, 2016 (2016:344) Plan: We will execute CAP 1407 to recover from this morning's unplanned DPA side A power off anomaly. Steps: 1. Turn on DPA-A, using SOP_ACIS_DPAA_ON 2. SOT/ACIS verify ACIS operation 3. Uplink command load 1A_WS007_164.CLD, containing the command WSVIDALLDN to power down the video boards. 4. Enable and activate SCS 164 (to execute the command) 5. Clear and disable SCS 164. 6. If approx 30 min remain in the comm, continue, otherwise wait til the evening comm 7. Reload the ACIS flight software patches, using SOP_ACIS_SW_STDFOPTG. This SOP also restarts the DEA housekeeping task. 8. Reset the focal plane temperature to -121C, using SOP_SI_SET_ACIS_FP_TEMP_TO_M121C On console: John ZuHone and Dick Edgar Detailed timeline (times Z on 2016:344): 22:21:57 UTC 2016 AOS 22:27:46 UTC 2016 _________ dpaa_on 22:28:37 UTC 2016 _________ verify status: patch level 14 22:28:42 UTC 2016 _________ uplink WSVIDALLDN command 22:29:35 UTC 2016 _________ execute same 22:30:26 UTC 2016 _________ clean up SCS 164 22:31:47 UTC 2016 _________ check time 22:34:59 UTC 2016 _________ uplink flight software patches 22:56:35 UTC 2016 _________ warm-boot BEP to patch level 53 23:04:57 UTC 2016 ----- activate housekeeping 23:07:55 UTC 2016 ----- end patch SOP 23:08:20 UTC 2016 ________ set FP temp to -121C 23:13:51 UTC 2016 done