See http://cxc.harvard.edu/mta/SOT_reports/sot-shift.html Report M8964. Start at 2024:036:20:25 UT = 3:25 pm ET February 5, 2024 End at 2024:036:21:15 UT = 4:15 pm ET February 5, 2024 ACIS SOT Shift Report February 5, 2024 ACIS Personnel: Paul Plucinsky, Catherine Grant PLAN ---- Run CAP1733 to start a 24 hour ECS measurement after a NSM. The ObsID for this measurement is 62619. This is a 3-CCD ECS measurement. CLD File executed: 1A_ECS3B_24H_135.CLD SUMMARY: -------- OC/CC were able to come up early on the spacecraft as we were still finishing the CAP review. The ACA team did two full field searches to improve our knowledge of where the spacecraft is pointing. After that, we were able to execute CAP1733 to start the ECS measurement. The CAP executed as expected and ACIS is collecting ECS data with S3, I2, & I3. TIMELINE (GMT day 036) ---------------------- 20:10? AOS, came up early on the spacecraft 20:11 OC/CC perform state of health and start SSR dump 20:15 ACIS FSW version 60, science idle, FP Temp = -107.6C 20:25 ACA team conducts full field search 20:30 only 2 stars found, decide to search with a different set of parameters to hopefully find fainter stars 20:35 second full field search finds more stars and provides a more accurate attitude solution 20:40 start CAP 1733 20:41 enable SCS 107 20:42 ObsID set to 62619 20:44 SCS-135 enabled and activated 20:45 command echoes for WSPOW commands 20:46 startScience command 20:47 FP temp = -107.1 C, 1DPAMZT = +32.2C ; 1DEAMZT = +28.0 C 20:55 1DPICACU = 1.18A ; 1DPICBCU = 0.62A 21:02 Event data telemetering, threshold crossings, event rates , delta overclock look nominal 21.05 inform OC that the science run is nominal and we can exit the CAP for now 21:11 FP temp = -106.9 C 21:12 S3 5970 accepted events in 167 exposures, 11.1 cts/s 21:12 I2 5596 accepted events in 167 exposures, 10.5 cts/s 21:12 I3 5454 accepted events in 167 exposures, 10.2 cts/s 21:15 LOS