See http://cxc.harvard.edu/mta/SOT_reports/sot-shift.html Report H9212. Start at 2024:284:23:53 GMT = 7:54 pm ET October 10, 2024 End at 2024:285:01:30 GMT = 9:30 pm ET October 10, 2024 ACIS SOT Shift Report October 10, 2024 ACIS Personnel: John ZuHone, Catherine Grant, Paul Plucinsky PLAN ---- Run CAP 1759 to start a 24 hour ECS measurement after an autonomous radiation shutdown interrupting the OCT0724 load products. The ObsID for this measurement is 62615. This is a 4-CCD ECS measurement. CLD File executed: 1A_ECS4_24H_135.CLD SUMMARY: -------- The CAP executed as expected. TIMELINE (GMT days 284-285) --------------------------- 23:53 AOS 00:03 ACIS FSW version 60, science idle, FP Temp = -118.7 C 00:03 1DPAMZT = 18.29 C, 1DEAMZT = 16.58 C, 1PDEAAT = 27.17 C 00:13 Begin CAP 1759 00:14 FMT 2, switch to EPS subformat 00:16 Enable SCS 107 00:18 ObsID set to 62615 00:19 1A_ECS4_24H_135.cld uplinked 00:20 SCS-135 enabled and activated 00:20 First stop science 00:22 power up command 00:22 start science 00:24 1STAT1ST = science active 00:26 1DPICACU = 1.20 A ; 1DPICBCU = 1.0 A 00:34 Bias packets telemetering 00:36 1DPICACU = 1.12 A ; 1DPICBCU = 0.96 A ; 1DEICACU 1.60 00:43 Event data telemetering, FP Temp = -117.4 C 00:43 Event data looks nominal 01:30 LOS