See about rad_summ for the definition and origin of the values below.
Orbit start: | -- (-- ksec in this period) |
---|---|
Current altitude/orbit leg: | -- (km) |
Current configuration: | -- |
Next comm: | -- (-- hours) |
Next rad zone: | -- (-- hours) |
Last updated: | -- |
(all times on this page are UTC)
Attenuated - projects fluences based on upcoming SI and grating configuration
ACIS effective exposure times (ks) Until next radzone: -- Until next comm: -- |
||||||
---|---|---|---|---|---|---|
Current Flux | Current fluence (total so far in current orbit) |
Projected fluence until next rad zone |
Projected fluence | Limits | ||
(p/cm^2-s-sr-MeV) | (p/cm^2-sr-MeV) | at current flux (at 2X flux) *at 10X flux* |
until next comm. | until second comm. | ||
CRM | -- | -- |
-- (--) *--* |
-- | -- | Yellow Limit: 1.0e+09 (fluence) |
ACE P3 | -- | -- |
-- (--) *--* |
-- | -- | Alert Trigger: 1.0e+09 (fluence) |
GOES-R (P4) | -- | -- | -- | -- | -- | |
GOES-R (P7) | -- | -- | -- | -- | -- | |
GOES-R (E>2.0MeV) | -- | -- | -- | -- | -- | |
External - does not take the instrument configuration into account | ||||||
Current Flux | Current fluence (total so far in current orbit) |
Projected fluence | Projected fluence | Limits | ||
(p/cm^2-s-sr-MeV) | (p/cm^2-sr-MeV) | until next radzone (total for current orbit) |
until next comm. | until second comm. | ||
CRM | -- | -- |
-- (--) *--* |
-- | -- | |
ACE P3 | -- | -- |
-- (--) *--* |
-- | -- | 3.6e8 (2 hr fluence, red) |
GOES-R (P4) | -- | -- | -- | -- | -- | 30.0/90.9 (flux, yellow/red) |
GOES-R (P7) | -- | -- | -- | -- | -- | 0.25/0.70 (flux, yellow/red) |
GOES-R (E>2.0MeV) | -- | -- | -- | -- | -- |
Green lines indicates fluence estimates based on the current KP value.